Longest flooded tunnel survey using an ROV

- Who
- ASI Marine
- Where
- Finland
- When
- March 1999
In March 1999, the remotely operated vehicle ASI Mantaro successfully completed a 120km 74.56 miles survey of the Paijanne Tunnel in Finland. Using sonar and video, the robot mapped debris from a collapse in the water-supply tunnel, which was a threat to the drinking water supply to the Helsinki area.